Grade and slope calculator for yards and driveways

Measure how much the ground drops over a distance and see the slope as a percent, a ratio and an angle, with a plain drainage check.

Enter the drop and the distance it happens over.

Guidance only. Your lot's approved grading plan and the Ontario Building Code's site-grading rule (keep water from collecting against the building) set the real requirements.

How to measure the slope of a yard

Tie a string to a stake at the house wall, run it out 10 ft to a second stake, and level it with a line level. The distance from the string down to the ground at the far stake is the drop. Enter both numbers. A long straight board with a spirit level works the same way over a shorter run. Measure in two or three places, because yards rarely fall evenly.

Reading the result

SlopeWhat it usually means
Falls toward the houseWater runs to the foundation. Fix this first.
Under 1%Too flat; water tends to sit and soak in near the house.
1–2%Drains slowly; puddles after heavy rain are common.
2% or moreDrains. Paved surfaces we build fall at least 2% (about ¼ in per foot).
Over about 33% (1:3)Hard to mow and prone to erosion; terraces or a wall may suit it.

The Ontario Building Code asks that a building site be graded so water doesn't collect against the building. It doesn't give a single number for every yard, and many subdivisions have an approved grading plan that does. If you have one, it wins over any rule of thumb.

Fixing a yard that slopes the wrong way

Most fixes start at the house: build the grade back up with compacted fill and topsoil so it falls away, extend downspouts, and give the water a legal place to go, such as a swale, the street side or a lower part of your own lot, never a neighbour's. Where the yard drops steeply, short retaining walls turn one slope into level terraces. See drainage and grading and retaining walls; our typical GTA range for a grading and drainage fix is $3,500–$9,000.

Percent, ratio and degrees

Percent grade is the drop divided by the distance, times 100. A 6 inch drop over 10 ft is 5%. The same slope is a ratio of 1:20 and an angle of about 2.9 degrees. Builders and grading plans usually use percent; walls and embankments are often described as ratios.

Questions about this tool

How do I calculate the slope of my yard?

Divide the drop by the distance, in the same units, and multiply by 100. A 6 inch drop over 10 ft (120 inches) is 6 ÷ 120 × 100 = 5%. Measure with a string, two stakes and a line level, starting at the house wall, and check two or three spots.

How much should my yard slope away from the house?

Enough that water runs away rather than sitting: paved surfaces we build fall at least 2%, about a quarter inch per foot. The Ontario Building Code asks that water not collect against the building, and your subdivision's approved grading plan, if you have one, sets the exact numbers for your lot.

What does a 2% slope mean?

The ground drops 2 units for every 100 units of distance: about a quarter inch per foot, or 2 cm per metre. Over 10 ft that is about 2.4 inches. It is a common minimum for paved surfaces to shed water, and it is barely visible to the eye.

When does a slope need a retaining wall?

When it is too steep to mow or keeps washing out, roughly steeper than 1:3, or when you want level space for a lawn or seating. Short terraced walls drain more easily than one tall wall, and walls over 1 m of exposed height near public areas need a permit and engineer.

Sources

Reviews

What homeowners say.

4.9★★★★★16 Google reviewsRead all reviews on Google
“Absolutely amazing job by the team. I love the result.”
Danylo H. · Google review
“The guys are professionals, you can tell when people know what they're doing.”
Yurii A. · Google review

Free estimate · 3 taps

Get your free estimate in 30 seconds.

Tap your answers, leave a name and number, and a real person calls or texts you back within one business day.

Step 1 of 4What do you need done?
Step 2 of 4How big, roughly?
Step 3 of 4Where is the property?
Step 4 of 4Where should we send your estimate?

Free, no obligation. Privacy

Free estimate

Tell us about your project.

Send the basics and a photo if you have one. A real person replies within one business day.

  • 01We call or text back to understand the job.
  • 02Free on-site visit to measure and check grades.
  • 03A clear written quote. No pressure.

Step 1 of 5What would you like done?
Step 2 of 5When would you like it done?
Step 3 of 5Where is the property?
Step 4 of 5Anything we should know? (optional)
Step 5 of 5Where should we send your estimate?

We only use your details to reply about this project. Privacy

Call 437-299-1681CallTextQuote